Blog
Notes on specifying and running cremation plant.

Shenzhen-scale municipal cremation plant: manufacturing capacity signal
Why a municipal funeral-home cremation and flue-gas package matters when overseas buyers evaluate Nanrui’s Jiangxi manufacturing line.

Export packing and site prep for overseas cremator projects
Ocean freight packing, hall door clearances, fuel and power interfaces, and documents overseas buyers should prepare before shipment.

Specifying AGV remains transport in a crematorium layout
Corridor width, payload, omnidirectional steering, and how Andu AGVs fit indoor logistics between cold room and cremator.

Cremator installation and commissioning timeline
What overseas funeral plants should schedule: mechanical install, refractory curing, burner setup, operator training, and first fire.

Flue gas treatment for cremators: what buyers ask
Mercury abatement, NOx, dust, dioxins, and how to RFQ a cremator flue-gas filter package without unverified CE claims.

Pet crematorium equipment checklist
Specify pet cremation furnaces by capacity class (30 / 50 / 70 kg), throughput per day, and when a dedicated pet hall beats sharing human retorts.

Diesel vs gas cremators for funeral homes
How overseas buyers choose light diesel or natural gas cremators — autonomy, permits, dual-fuel options, and what to put on the RFQ.

How to choose an ash-collection cremator for a funeral home
Buyer checklist for trolley-type ash-picking cremators: chamber, cooling trolley, PLC, fuel duty, and when to specify OYJ5000–7000.